Task Team on Ground-Based Remote Sensing Measurements
A Task Team of AOPC Working Group on GRUAN (WG-GRUAN)
Background
The GCOS/WCRP Atmospheric Observation Panel for Climate (AOPC) Working Group on the GCOS Reference Upper Air Network (GRUAN) was established in 2006 in recognition of the importance of initiating reference-quality observations of atmospheric column properties, in particular temperature and water vapour, from the surface into the stratosphere to enhance the monitoring and understanding of climate variability and change. A GRUAN Implementation Plan was published in July 2009 covering the period until 2013. At the second Implementation and Coordination Meeting held in Payerne, Switzerland in March 2010 the Working Group, Lead Centre and initial sites agreed to the instigation of a number of task teams.
The task team on Ground-Based Remote Sensing Measurements (TT-GB) exists to define protocols, sampling strategies and required metadata for respective suites of ancillary ground based remote sensing measurements routinely collected and archived at GRUAN sites. Ancillary in this respect is defined as measurements at a given GRUAN site that do not fall under the set of required observations from all sites, for example the reference radiosonde. Ancillary in this sense also includes required respective instrument calibration, inter-validation strategies and results and all metadata pertinent to the deployed equipment and associated measurement suites. These shall be compiled utilizing best measurement practices as defined through associated measurement international expert team representation in this group. Practices and protocols for respective measurement suites as defined by this group shall constitute guidelines for respective site and measurement certification.
Duties
Under the auspices of the WG-GRUAN the task team was established to:
- Interface with other expert teams (e.g., NDACC, ARM, MWRnet)
- Evaluate the data products (uncertainty budget etc.) and bring in missing knowledge
- Inventory potential instruments (and interface with other GRUAN-Task Teams if needed)
- Establish campaign rationales for the validation of data from multiple platforms
- Establish a system for the routine collection and display of data from multiple platforms
- Develop guidance on the type and number of data and associated metadata needed to be stored from the instruments, as needed
- Draw conclusions on the suitability of the deployed equipment and advise accordingly the GRUAN Task Team on Sites
- Report to WG-GRUAN on all above duties
Reporting and governance
- The task team shall be run by at least two co-chairs and they should use as primary points of contact the co-chair of WG-GRUAN and Head of the GRUAN Lead Centre as deemed appropriate.
- The task team co-chairs shall report on a six-monthly basis in February and August to the WG-GRUAN a brief written progress report which will also be posted as part of official documentation relating to GRUAN. These reports will be discussed on a phone conference between WG-GRUAN the Lead Centre and all task teams with representation from at least one co-chair from this task team.
- At least one task team co-chair and potentially additional task team members shall attend, as deemed appropriate and affordable, the annual ICMs to report in person on progress.
- The task team will be expected to respond to all reasonable formal requests for advice from the WG-GRUAN, Lead Centre, other task teams or sites made on an ad-hoc basis in a timely manner. Guidance on what constitutes reasonable can be solicited from WG-GRUAN as required.
- As part of their inventory duty, the task team will be expected to interact with the GRUAN task team on Sites
Operation
- The task team will largely coordinate by email and teleconference and take advantage of other meetings where a quorum is in attendance to undertake in person meetings. It is expected that teleconferences between all task team members will be undertaken at a minimum 6-monthly frequency.
- Task team chairs will seek funding for dedicated meetings if deemed appropriate.
- The task team will exist until such time as its duties are deemed to have been completed by the WG-GRUAN
- Task team terms of reference and membership will be revised periodically, coincident with revisions to the WG-GRUAN Terms of Reference (ToR) or if requested by either party, by the task team members in consultation with WG-GRUAN.
Members
(as at 2021-02-05)
Name | Organisation |
---|---|
Nico Cimini (co-chair) | CNR-IMAA, IT |
Thierry Leblanc (co-chair) | NASA/JPL, US |
Arnoud Apitouley | KNMI, NL |
Maria Cadeddu | ANL, US |
Jonathan Gero | University Wisconsin, US |
Jim Hannigan | NCAR, US |
Christine Knist | DWD, DE |
Fabio Madonna | CNR-IMAA, IT |
Gianni Martucci | MeteoSwiss, CH |
Christoph Ritter | AWI, DE |
Matthias Schneider | KIT, DE |
Michael Sommer | DWD, DE |
Presentations and Reports
Terms of reference
- Terms of reference
ICM-15
- Task Team Progress Report for March 2024 – Ground-Based (N. Cimini, T. Leblanc)
- The GRUAN Task Team on Ground Based Remote Sensing Measurements (TT GB)
ICM-14
- Task Team Progress Report for November 2022 – Ground-Based (N. Cimini, T. Leblanc)
- The GRUAN Task Team on Ground Based Remote Sensing Measurements (TT GB)
ICM-12
- Task Team Progress Report for November 2020 – Ground-Based Remote Sensing Measurements (N. Cimini, T. Leblanc)
- Flash update on: the GRUAN Task Team on Ground-Based Remote Sensing Measurements (TT-GB) and the GRUAN Lidar Product (T. Leblanc, N. Cimini)
- Progress towards a GRUAN MWR product (N. Cimini, F. Madonna)
ICM-11
- Task Team Progress Report for April 2019 – Ancillary (L. Borg, T. Leblanc)
- GRUAN Task Team on Ancillary Measurements 2018-2019 activity report (T. Leblanc, L. Borg)
ICM-10
- Task Team Progress Report for April 2018 – Ancillary (T. Leblanc, T. Reale)
- GRUAN Task Team on Ancillary Measurements 2017-2018 activity report (T. Leblanc, T. Reale)
ICM-9
- Task Team progress report for June 2017 – Task Team Ancillary Measurements (TTAM) (T. Leblanc, T. Reale)
- Ground-based Ancillary Measurements 2016-2017 activity report (T. Leblanc, T. Reale)
ICM-8
- Ancillary Measurements (TTAM) (T. Leblanc, T. Reale)
ICM-7
- Task Team 5 (Ancillary Measurements, TT-AM) 2015 Report (T. Leblanc, T. Reale)
- GRUAN Lidar Data Stream: Progress Status (T. Leblanc)
- Water vapour, temperature and aerosol retrievals using RALMO Raman LIDAR at the Payerne GRUAN site (G. Martucci)
- Towards a GRUAN MWR product (D. Cimini)
- Task Team progress report for February 2015 – Task Team Ancillary Measurements (TTAM) (T. Leblanc, T. Reale)
ICM-6
- Task Team 5 (Ancillary Measurements, TT-AM) 2014 Report (T. Reale, M. De Maziere, T. Leblanc)
- Ancillary Measurements (TTAM) (T. Leblanc, T. Reale)
- Task Team on Ancillary Measurements (TTAM) progress report for Feb. 2014 (T. Leblanc, T. Reale)
ICM-5
- Task Team 5 (Ancillary Measurements) Report (T. Leblanc, T. Reale)
- Satellite Products Cal/val and Climate Research Support using GRUAN (T. Reale)
- Task Team 5 (Ancillary Measurements) progress report 01/2013 (T. Leblanc, T. Reale)
ICM-4
- GRUAN Task Team on Ancillary Measurements (TTAM) ICM-4 Report (T. Leblanc, T. Reale)
- Task Team 5 (Ancillary Measurements) progress report 01/2012 (T. Leblanc, T. Reale)
- Bringing Lidar Data Online as a GRUAN Data Product (T. Leblanc)
ICM-3
- Ancillary measures (T. Leblanc, T. Reale)
- Task Team 5 (Ancillary measures) progress report 01/2011 (T. Leblanc, T. Reale)